Electrification and automation of an industrial cooling tower

  • Building & construction
  • Industrial electrical engineering
  • PLC / PC programming

For a global stainless steel producer, Elenco delivered the complete electrical installation and automation of a new industrial cooling tower: from power panels and pump and fan control to PLC programming.

Row of XXL electrical cabinets under construction in the Elenco workshop

For a global stainless steel producer, Elenco delivered the complete electrical installation and automation of a new industrial cooling tower. The installation is part of a new production line in which considerable amounts of heat are released during the production process. The process heat that cannot be recovered is discharged through an external cooling tower.

Elenco was responsible for the entire electrical part of the project. This covered the design and construction of the power panels, the electrical control of the pumps and fans, and the development and programming of a PLC to control the various valves and frequency converters.

Engineering and component selection

Siemens was chosen for the automation, at the request of the end customer and because of the brand's strong expertise in industrial automation. Rittal was selected for the electrical cabinet building. Its technical capabilities, the copper busbar system it uses and its ability to supply large distribution panels were decisive.

Together, the power panels formed an impressive row of cabinets of around 15 metres. To determine the right configuration and components, Elenco worked closely with itsme Breemes, Siemens and Rittal. Thanks to this collaboration, the technical requirements could be mapped out in advance and the right components and accessories were selected.

Row of new control panels for the electrification of a cooling tower

From design to automation

Alongside the electrical engineering, Elenco also took care of the software development and PLC programming. The various pumps, fans, valves and frequency converters were integrated into one coherent automation system.

By combining electrical engineering, cabinet building, cabling and industrial automation, Elenco could take on the complete electrical scope of the project.

Elenco electrical engineer next to the new control panels for a cooling tower

Collaboration as the key to success

The collaboration between Elenco, itsme Breemes, Siemens and Rittal played an important role in the preparation and execution of this large-scale project. By combining the technical expertise of the different partners, Elenco could focus fully on the engineering and automation of the installation.

The result is an integrated electrical and automation solution for an industrial cooling tower, tailored to the specific requirements of a demanding production environment.

Want to know more about the technical execution of this project? Read the original article by our partner itsme Breemes, which explains the collaboration and the technical challenges of this project in more detail.

Read the full article (in Dutch): Cooling tower electrification – itsme Breemes

Newsletter

News and
insights in
your inbox?